Progress is a little slow cos i am waiting for our contractor to update on the cost of PE so that we can hack the study room wall down…and then things will really start moving along.  What can be done, has pretty much been done.

Our balcony wall tiles on both sides have been completed.

They have laid floor protection for the kitchen area…so that when the study wall comes down, it doesn’t scratch up the pretty black and white tiles.

Master bedroom tiles have been laid,…we tried to feel for “popping” and it was fine

The guest room (green wall room) has been tiled too…the walkway upstairs have been tiled…tiling in the study can’t be done for now cos we need to do the hacking.

If PE is going to take a while, our IDers have updated us that they will start with electrical work first to save time…  :good: